...

Landlords

The landlord compliance calendar: every recurring obligation, and when it falls due

Compliance failures are rarely deliberate. They happen because a renewal date passed unnoticed. Here is the full list, organised by when each obligation recurs.

12 October 2026

·

8 min read

The landlord compliance calendar: every recurring obligation, and when it falls due

Almost every landlord compliance failure has the same cause: a date that was not in a diary. The gas certificate that expired three weeks ago. The EICR that was due last year. The alarm that was never tested at the start of the second tenancy. None of these are difficult to do. They are difficult to remember, across multiple properties, alongside everything else. This guide lists the recurring obligations for a private landlord in England, grouped by how often they fall due, so they can be diarised once and then followed.

Before every new tenancy

Right to rent checks on every adult occupant, completed before the tenancy starts, with copies retained. Provision of the current gas safety certificate, EICR, EPC and the government’s How to Rent guide; failure to provide these prevents certain notices being served. Smoke alarms on every storey and carbon monoxide alarms in every room with a fixed combustion appliance, tested and working on day one, with the test recorded. Deposit taken and protected in a scheme within 30 days, with the prescribed information served in the same period. An independent check-in inventory, signed by the tenant. Legionella risk assessment reviewed. Under the Renters’ Rights Act, confirmation that the landlord’s database registration is current and the property is included.

The inventory clerk is often the person who tests the alarms and records the certificate dates, which makes the check-in report a useful compliance record as well as a condition record.

A gas boiler in a rented flat

Every year

Gas safety check by a Gas Safe registered engineer, with the certificate provided to the tenant within 28 days. The check can be done up to two months before the previous certificate expires without losing the anniversary date. Portable appliance testing is not a legal requirement in residential lets but is good practice for landlord-supplied appliances in furnished properties, and expected in HMOs. Review of rent, if an increase is planned, using the statutory notice procedure. Review of landlord insurance, ensuring it reflects current use and occupancy. Boiler service, which is not a legal requirement but is commonly a condition of the boiler warranty and of many insurance policies.

Every five years

Electrical Installation Condition Report by a qualified electrician, with a copy to the tenant within 28 days and to the local authority on request. Any remedial work identified must be completed within 28 days or the period specified in the report. This is the requirement most often missed by landlords who bought or inherited a property with an old report and never diarised the renewal.

Every ten years

Energy Performance Certificate. An EPC is required at marketing and must be valid throughout; a property cannot be let with a rating below E unless an exemption is registered. Minimum standards are expected to rise to C over the coming years, and landlords of D and E rated properties should be planning improvements now rather than when the deadline arrives.

An electrical consumer unit in a hallway cupboard

Periodically during the tenancy

Property inspections, typically every six months, with at least 24 hours’ written notice and a written record. These are not a legal requirement in themselves but they are how a landlord discharges the duty to keep the property in repair and identifies hazards under the Decent Homes Standard and Awaab’s Law. Alarm tests at each inspection. Review of any licence conditions for an HMO or in a selective licensing area.

On specific triggers

When a tenant reports a repair: acknowledge, inspect within the timescale required for the type of issue, and remedy within the timescale set by Awaab’s Law for damp, mould and other hazards. When works are done to the electrical installation: a new certificate for that work. When the boiler or gas appliances are replaced: a new gas safety record. When occupancy changes in an HMO: check licence conditions on occupant numbers. When a tenant requests a pet: respond in writing within the statutory period. When a tenant gives notice: begin the end-of-tenancy process.

HMO-specific

Licence renewal, typically every five years, with the application submitted well before expiry. Fire alarm system service every six months and a full test annually. Emergency lighting test monthly with an annual full test. Fire risk assessment reviewed annually and after any material change. Fire door checks at every inspection. Compliance with room size and amenity standards on every change of occupant.

Records to keep and for how long

Gas certificates for two years. EICRs until superseded. Right to rent documents for the duration of the tenancy and one year after. Deposit protection certificates and prescribed information for the duration and six years after. Inventories, inspection reports and check-out reports for six years after the tenancy ends, covering the limitation period for contractual claims. All correspondence about repairs and condition for the same period.

Putting it in a calendar

For each property, enter the anniversary dates for gas, EICR and EPC with reminders two months ahead. Enter inspection dates six months apart. Enter the HMO licence expiry two years ahead. For each tenancy, enter the deposit protection deadline on the day the deposit is received, and the alarm test and inventory on the day before move-in. Review the calendar quarterly. The whole exercise takes an hour to set up per property, and it is the difference between compliance that happens and compliance that is discovered to have lapsed when it is too late to fix.

You may also want to read why we recommend Hawk Electrical for landlord EICRs in Bristol.

Need a report you can rely on?